GENERAL INFORMATION:

Name: Ha Hoa Industrial Park – Phu Tho
Investor: Management Board of Industrial Parks of Phu Tho Province

Operation: 01/2019 – 01/2069
Location: Ha Hoa district, Phu Tho province

Area: 400ha
Building destiny  (%):60 (%)

  1. Priority investment:

Textiles, mechanics

Processing of agricultural and forestry products,

Production of consumer goods,

production of building materials,

Mineral processing industry

Manufacture and assembly of electrical and electronic equipment

Details of industries eligible for investment incentives are based on Article 16 of the Law on Investment.

  1. Location of the industrial park.

Ha Hoa Industrial Park is located in the northwest of Phu Tho province, in Ha Hoa district, and is a hub for goods transshipment between Phu Tho and the northwestern provinces. There is a convenient transportation system both by road and waterway, near the intersection of Xuyen A road (Noi Bai – Lao Cai), about 4 km from Highway 32C.

– To:

Viet Tri City 15 km.

Noi Bai International Airport 110 km.

Hai Phong Seaport 240 km

Hanoi city center 140 km

Samsung Bac Ninh 130km

III. Infrastructure of the industrial park.

 – Transportation system:

Internal roads: The internal traffic system is completely built and arranged in the industrial park’s premises. The central road of the industrial park is 44.5m wide, the branch roads are 11.5m wide. Along the roads, there are sidewalks of 3-5m wide, where technical corridors such as electricity, water supply and drainage, information and lighting systems and landscape are arranged.

Electricity system:

From the 110/22 kV transformer station with a capacity of 40MVA of the industrial park and the 22 KV transmission line system to supply power to the fences of factories.. Power transmission system along the land lots to ensure full power supply enough and stable for all investors.

Water supply system:

The system includes a water supply plant with a capacity of 10,000m3/day and a water supply pipe system from D100mm- D300mm with an average depth of 1.2m pipe laying along the plots of land to ensure water supply to each investor in industrial area.

Drainage system:

Rainwater drainage system and sewerage system are built separately, rainwater is collected through the sewer system and discharged into rivers in the area. The diameter of underground storm drain is D600mm- D1000mm designed according to the principle of self-flow.

– Sewerage system:

Designed capacity of 5,000 m3/day, the treated water will meet the wastewater standard after treatment in column A according to QCVN 24:2009 of the Ministry of Natural Resources and Environment.

Communication systems:

The communication system was built to the foot of the fence of the factories, meeting all kinds of domestic and international communication services directly invested and built by large Telecommunications enterprises.

IV. Costs and incentives: 

– Leasing price:

-Land rent: 60-65 USD/m2/50 years (depending on the location of the land lot).

Service fee for management and maintenance: 0.4 USD/m2/year.

– Electricity fee in 2021:

 Normal Hours: 1,555 VND/Kwh (0.067 USD/Kwh) (Monday to Saturday: 4am-9:30pm, 11:30pm and 8pm-22pm / Sunday: 4am – 10pm)

Off-peak hours: 1,007 VND/Kwh (0.04 USD/Kwh) (All weekdays from 10 pm to 4 pm)

Peak hours: 2,871 VND/Kwh (0.123 USD/Kwh) (Monday to Saturday: 9:30 am – 11:30 am; and 5:00 pm – 8:00 pm/ Sunday without peak hours)

– Water fee: 16,500 VND/m3 (equivalent to 0.762 USD/m3)

– Waste water treatment fee: 6,500 VND/m3 (equivalent to 0.28 USD/m3)

– Expenses for phone, internet and other services: according to regulations of service providers.

Preferential:

 Exemption from ENTERPRISE INCOME TAX for the first 2 years; 50% reduction for the next 04 years; pay tax at 17% for the remaining years (for ordinary investment projects).

– Exemption from ENTERPRISE INCOME TAX for the first 4 years; 50% reduction for the next 09 years; then only have to pay tax at 10% for the next 10 years (for projects eligible for investment incentives).

– Exemption from import tax on equipment, supplies, means of transport and other goods to create fixed assets.

– Exemption from import tax for raw materials and accessories imported from abroad to serve the production of export goods.

– Exemption from income tax from technology transfer activities for projects eligible for investment incentives.

– Enterprises with losses may carry forward their losses to the following year. These losses are deducted from taxable income. The loss transfer period shall not exceed 05 years, counting from the year following the year when the loss is incurred.

– Other incentives according to the general regulations of the Government.

V . Labor Source

– The population of Ha Hoa district is 108.556, the population of Phu Tho province is 1,370,000, of which 61% are of working age. This is a source of labor that can be fully supplied to enterprises in industrial zones.– According to the latest report of the Management Board of Industrial Parks of Phu Tho province, the population of working age in the province is about 840,000 people.Population of districts near the industrial zone:+ Thanh Ba district: 109,806 people.+ Yen Lap district: 79,548 people.+ Tam Nong district: 82,370 people.+ Cam Khe district: 128,537 people.– The system of Universities, Colleges, Intermediate Schools, vocational training around the area is very diverse. Phu Tho province has 2 universities (Hung Vuong University and Viet Tri University of Industry) and 5 vocational colleges.Our services:After many years of working with FDI enterprises and domestic enterprises in the field of real estate, building factories, promoting investment, finding import-export partners. The staff of ATZ and our partner are committed to providing the best service to customers in the following areas:Consulting on land and real estate law.Construction law consulting.Consulting to find import-export partners.Legal services for business license, investment certificate in Vietnam.