GENERAL INFORMATION:

Name: Ha Hoa Industrial Park – Phu Tho
Investor: Viglacera joint stock companyOperation: 01/2016 – 01/2066
Location: Phu Tho Town, Phu Tho province

Area: 450ha
Building destiny  (%):60 (%)

  1. Priority investment:

Consumer goods manufacturing, food processing, pharmaceutical industries, ..Light industry; electronics assembly industries; machine manufacturing industry; automobile and motorbike manufacturing and assembly industry;Production of high-grade building materials;Goods gathering warehouse, warehouse waiting for export, tax-suspension area, ..Details of industries eligible for investment incentives are based on Article 16 of the Law on Investment.

  1. Location of the industrial park.

Phu Ha Industrial Park is located in the center of Phu Tho province, in the area of ​​Phu Ho, Ha Loc and Ha Thach communes of Phu Tho town. The transportation system is convenient for both waterways, roads and railways. Adjacent to Ho Chi Minh route and near IC9 intersection to Xuyen A road (Hanoi – Lao Cai highway), about 4 km from National Highway 2. Near the Red River and with the Hanoi – Lao Cai railway running through,

– To:

Phu Tho Station 3 km.

Noi Bai International Airport 60 km.

Hai Phong seaport 190 km

Hanoi city center 90 km

Samsung Bac Ninh 100km

III. Infrastructure of the industrial park.

According to the approved plan, Phu Ha Industrial Park Phase I has an area of ​​350ha, located in Ha Thach, Ha Loc and Phu Ho communes. The planning boundary has a 35m urban main road crossing between Phu Ha Industrial Park, divided into two northern and southern subdivisions. The terrain of the industrial park is low hilly, good geology is favorable for factory construction and factory infrastructure reduces initial construction investment costs. The adjacent urban-service area is synchronously planned to facilitate the lives and activities of workers, creating favorable conditions for attracting human resources.The northern subdivision has an area of ​​230 ha, the southern subdivision is 119 ha, in the puzzle: 258 ha of factories and warehouses; 14.64ha of administrative and service works; 37.8ha of green land; 28.4 ha of land for traffic and 11.18 ha of land for technical zones….with power system; rainwater supply and drainage system; traffic; wastewater drainage, environmental sanitation synchronously.

Transportation system:

Internal roads: The internal traffic system is completely built and arranged in the industrial park’s premises. The central road of the industrial park is 78m wide, the branch roads are 40m  and 16.5 wide. Along the roads, there are sidewalks of 3-5m wide, where technical corridors such as electricity, water supply and drainage, information and lighting systems and landscape are arranged.

Electricity system:

From the 110/22 kV transformer station with a capacity of 63MVA of the industrial park and the 22 KV and 35KV transmission line system to supply power to the fences of factories.. Power transmission system along the land lots to ensure full power supply enough and stable for all investors.

Water supply system:

The system includes a water supply plant with a capacity of 13,500m3/day and a water supply pipe system from D100mm- D300mm with an average depth of 1.2m pipe laying along the plots of land to ensure water supply to each investor in industrial area.

Drainage system:

Rainwater drainage system and sewerage system are built separately, rainwater is collected through the sewer system and discharged into rivers in the area. The diameter of underground storm drain is D600mm- D1000mm designed according to the principle of self-flow.

– Sewerage system:

Designed capacity of 7,500 m3/day, the treated water will meet the wastewater standard after treatment in column A according to QCVN 24:2009 of the Ministry of Natural Resources and Environment.

Communication systems:

The communication system was built to the foot of the fence of the factories, meeting all kinds of domestic and international communication services directly invested and built by large Telecommunications enterprises.

– Service infrastructure:The industrial park is planned to be 146,000 m2 to build an operation center and customs service facilities, banks, post offices, logistics, gas stations, fire prevention and fighting, etc. to create a synchronous environment to help businesses. invest in administrative and production work only within the industrial park.IV. Costs and incentives: 

– Leasing price:

-Land rent: 45-50 USD/m2/50 years (depending on the location of the land lot).Service fee for management and maintenance: 0.4 USD/m2/year.- Electricity fee in 2021: Normal Hours: 1,555 VND/Kwh (0.067 USD/Kwh) (Monday to Saturday: 4am-9:30pm, 11:30pm and 8pm-22pm / Sunday: 4am – 10pm)Off-peak hours: 1,007 VND/Kwh (0.04 USD/Kwh) (All weekdays from 10 pm to 4 pm)Peak hours: 2,871 VND/Kwh (0.123 USD/Kwh) (Monday to Saturday: 9:30 am – 11:30 am; and 5:00 pm – 8:00 pm/ Sunday without peak hours)- Water fee: 9,200 VND/m3 (equivalent to 0.4 USD/m3)- Waste water treatment fee: 6,500 VND/m3 (equivalent to 0.28 USD/m3)- Expenses for phone, internet and other services: according to regulations of service providers.Preferential: Exemption from ENTERPRISE INCOME TAX for the first 2 years; 50% reduction for the next 04 years; pay tax at 17% for the remaining years (for ordinary investment projects).- Exemption from ENTERPRISE INCOME TAX for the first 4 years; 50% reduction for the next 09 years; then only have to pay tax at 10% for the next 10 years (for projects eligible for investment incentives).- Exemption from import tax on equipment, supplies, means of transport and other goods to create fixed assets.